SP-HLVA-02
GENERAL INFORMATION |
|
Basic Functions |
|
Class Notations |
BUREAU VERITAS I + HULL + MACHINARY Offshore Support Vessel (Lifting), Unrestricted Navigation ALM, In water Survey, Accommodation |
MAIN PARTICULARS |
|
Length Overall |
98.950 m |
Length W.L. |
97.758 m |
Length P.P. |
95.958 m |
Breadth |
29.700 m |
Depth |
6.500 m |
Draught |
4.000 m |
Gross Tonnes |
|
Speed |
|
|
TANK CAPACITIES |
|
Diesel Oil |
631.09 m3 |
Fresh Water |
717.27 m3 |
Ballast |
28976.60 m3 |
Lube Oil |
47.00 m3 |
Greywater |
17.37 m3 |
Sewage |
466.48 m3 |
Bilge |
54.18 m3 |
Sludge |
24.43 m3 |
PROPULSION SYSTEM |
|
Main Engines |
2 x YANMAR 8EY26W |
Total Power |
2 x 2560 kW |
Propeller |
2 x Fixed Pitch / 4 Blades |
AUXILIARY ENGINES |
|
Generator (Main) |
4 x VOLVO PENTA –D16MG 425 Kw @1600 rpm |
Generator (Harbour) |
1 x VOLVO PENTA –D16MG 290 kW @155 rpm |
Total Power |
1990 kW (4x425 + 1x290) |
DECK EQUIPMENT |
|
Main Crane |
1 x LIEBHERR BOS 14000-600 D –LITRONIC 600 Tonnes @ 25 m |
Overhead Crane |
1 x 5 Tonnes |
2nd Deck Crane |
1 x 10 Tonnes @ 4-20 m |
Revolving Crane |
1 x 50 Tonnes |
ACCOMMODATION |
For 155 people, cabins are insulated and finished with durable linings, isolated wheelhouse, floating floors and air-conditioned rooms. The Captain’s cabin, Chief Engineer’s cabin, First and 2nd Engineer’s cabin, Officer’s cabin, 2 Suit cabin and 8 single cabin, Hospital; 24 workers’ room for 4 people, 6 workers’ room for 3 people, 4 double workers room, 7 double crew cabin, galley, mess room and sanitary facilities.
|
REFERENCES |
|
Owner |
B.O.C. |
Shipyard |
ENM KOREA |
Hull Number |
DSB1010 |